Brief Project Description:
Work performed under this contract included but was not limited to:
The complete overhaul of the HVAC system:
• Conversion of Pneumatic system to Direct Digital Controls (DDC).
• Up Grade all VAV (eliminate all pneumatics to them).
• Up Grade/Repair All Air Handling Units.
• Up Grade/Repair All Air Conditioning Units.
• Up Grade Supply and Return Registers.
• Redesign of the fin tube heating, to ensure adequate sizing.
• Up Grade/Repair Boiler.
• Upgrade fire suppression system throughout the building.
• Repair lavatories to include new upgrades to equipment and ventilation systems.
• Repair damaged/cracked flooring in warehouse.
• Repair roll‐up door in warehouse to install observation windows in the doors.
• Make necessary repairs to damaged walls (gypsum board), ceiling tiles and floor coverings.
• Seal building envelope (water repellent protection to the exterior block).
• Upgrade/Repair lighting in warehouse area.
• Upgrade break area next to main conference area.
• Enclose overhangs on east side of building.
• Evaluate adding circuits to the back‐up generator.
• Up Grade office space and common areas cosmetically (paint, floor coverings).
This project reflects Benaka Inc.’s experience in multi trade coordination.