Brief Project Description:

Construction, Repair & Alteration of electrical substation 6, was the 3rd task order under a Maintenance and Construction Job Order Contract that Benaka Inc. holds with the Portsmouth Naval Shipyard in Maine.

Work on this project included but was not limited to:

Demolition of pre-fabricated metal buildings 283 and 334, concrete fence curbing, main switch and transformer, switch board, panel board, feeder and load side conductors, bus cable-way, conduits and other miscellaneous components, construction of a new storage and regulator building, concrete foundation for transportable substation, concrete vaults, concrete encased conduit for primary and secondary feeders, chain link fencing, and concrete curbing and asphalt paving.

Contract Value:

$2,560,046

Client:

Portsmouth Naval Shipyard, Kittery, ME

Project Completion:

September 2013