Brief Project Description:
Major aspects of the work include:
• Removal and abatement of HAZMAT.
• Removal of existing roof and install new EPDM roof.
• Interior demolition of bathrooms, elevator and removal of existing MEP systems.
• Interior renovation of Classrooms and Labs to accept new raised flooring and other finishes.
• Extensive renovation of bathrooms, new lay out with new stalls and new fixtures.
• Majority of interior renovation also involved making the building HC accessible.
• Installation of new chillers and boilers and new ductwork with VAV and new DDC system.
• New primary and secondary lines with new XFMR and new switch gear with new sub panels and new lighting fixtures.
• Upgrade and modify existing sprinkler system with new fire alarm system.